Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 23, 2016, 04:51 PM
Date
05/23/2016
W/O
0568850
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00702
PipeID
P14110
Time
9:51 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7128
Sewer Name
18 SHOEMAKER AVENUE TRUNK
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
20160523AM_SHOEMAKER_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
18 0282
Downstream MH
18 0281
Dir. of Survey
Downstream
Length Surveyed
383.6 ft.
Total Length
383.6 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
14
Pipe schematic from manhole 18 0282 to 18 0281
MH: 18 0282MH: 18 0281downstream0 ft. AMH - Upstream Manhole, Survey Begins - 9:54 AM0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - ROACHES INSIDE THE MH.0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. MGO - General Observation - 70% MAG COAT FROM 09 TO 03 O'CLOCK, START2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start16.9 ft. MWL - Water Level, 40 %of cross sectional area20.1 ft. MGO - General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE48.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - UNKNOWN51.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - UNKNOWN65.4 ft. MGO - General Observation - 60% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE97 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"100.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - UNKNOWN148.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"151.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"197.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"200 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"204.6 ft. FL - Fracture Longitudinal, at 08 o'clock, within 8 inches of joint: YES204.7 ft. FC - Fracture Circumferential, from 07 to 08 o'clock, within 8 inches of joint: YES248.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"251.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"301.3 ft. MGO - General Observation - 75% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE301.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"304.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"349.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"353.1 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"381.6 ft. MGO - General Observation - SAGS THROUGHOUT THE REACH381.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish381.8 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish381.8 ft. MGO - General Observation - 60% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH382.9 ft. MGO - General Observation - ROACHES INSIDE THE MH.383.6 ft. AMH - Downstream Manhole, Survey Ends - 12:09 PM

Observation photos (8)

  • General Observation - ROACHES INSIDE THE MH.

    0 ft. - General Observation - ROACHES INSIDE THE MH.

  • General Observation - 70% MAG COAT FROM 09 TO 03 O'CLOCK, START

    2 ft. - General Observation - 70% MAG COAT FROM 09 TO 03 O'CLOCK, START

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

  • Water Level, 40 %of cross sectional area

    16.9 ft. - Water Level, 40 %of cross sectional area

  • General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

    20.1 ft. - General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

  • General Observation - 60% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

    65.4 ft. - General Observation - 60% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

  • Fracture Longitudinal, at 08 o'clock, within 8 inches of joint: YES

    204.6 ft. - Fracture Longitudinal, at 08 o'clock, within 8 inches of joint: YES

  • General Observation - 75% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

    301.3 ft. - General Observation - 75% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

Observations (33)

DistanceCodeObservation
2MGO70% MAG COAT FROM 09 TO 03 O'CLOCK, START
381.8SSS
20.1MGO30% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE
148.3TFC
197.1TFC
151.9TFC
51.8TFUNKNOWN
2SSS
381.8SAV
204.6FL
248.2TFC
0AMH9:54 AM
353.1TFA
16.9MWL
97TFC
383.6AMH12:09 PM
301.3MGO75% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE
382.9MGOROACHES INSIDE THE MH.
0MWM
0MGOROACHES INSIDE THE MH.
251.3TFC
65.4MGO60% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE
381.8MGO60% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH
349.8TFC
381.6MGOSAGS THROUGHOUT THE REACH
200TFC
301.3TFC
2SAV
304.3TFC
0MWL
48.5TFUNKNOWN
100.5TFUNKNOWN
204.7FC

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2016-05-23T09:51:37-07:00