2 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
51 ft. - General Observation - UNUSAL DROP IN WATER LEVEL
51 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
51 ft. - General Observation - MAG COAT 60% START 8:00 TO 4:00
65.9 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
66.8 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM
75.9 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
80.9 ft. - Surface Reinforcement Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
84 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: NO - CIRCUM
116.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG
124.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE
169.6 ft. - General Observation - MAG COAT 90% START
239.5 ft. - Surface Aggregate Missing, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 51 | MGO | UNUSAL DROP IN WATER LEVEL |
| 490.1 | SAV | SEVER AGG |
| 490.5 | AMH | 5:45AM |
| 51 | MWM | — |
| 51 | SAP | — |
| 51 | MWL | — |
| 169.6 | MGO | MAG COAT 90% START |
| 2 | SAP | SEVERE AGG |
| 0 | MWL | — |
| 80.9 | SRV | CIRCUM REBAR |
| 51 | SAV | SEVERE AGG |
| 490.1 | MGO | MAG COAT 90% FINISH |
| 124.3 | SSS | PEELING CONCRETE |
| 51 | MGO | MAG COAT 60% START 8:00 TO 4:00 |
| 490.1 | SSS | PEELING CONCRETE |
| 0 | MWM | — |
| 116.4 | SAV | SEVERE AGG |
| 158 | TF | OPEN |
| 239.5 | SAM | SEVERE AGG |
| 75.9 | SRV | CIRCUM REBAR |
| 0 | AMH | 4:55AM |
| 84 | SRV | CIRCUM |
| 66.8 | SRV | CIRCUM |
| 65.9 | SRV | CIRCUM REBAR |