Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 19, 2016, 09:30 AM
  • C 0294_C 0293_5192016_023745.mp4

  • C 0294_C 0293_5192016_051642.mp4

Date
05/19/2016
W/O
0563393
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00134
PipeID
P09754
Time
2:30 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H 0137
Sewer Name
C JOINT OUTFALL C - UNIT 6E
City
HAWAIIAN GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
20160514MDM_JOINT_OUTFALL_C_UNIT_6E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
C 0294
Downstream MH
C 0293
Dir. of Survey
Downstream
Length Surveyed
248.8 ft.
Total Length
248.8 ft.
Structural Index
3
Structural Quick
3423
Structural Rating
18
O&M Index
2
O&M Quick
2C00
O&M Rating
38
Overall Index
2
Overall Quick
Overall Rating
56
Pipe schematic from manhole C 0294 to C 0293
MH: C 0294MH: C 0293downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. OPEN0 ft. AMH - Upstream Manhole, Survey Begins - 2:30AM2 ft. MGO - General Observation - MAG COAT 50% START 9:00 TO 3:002 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE6.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE16.5 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped33.1 ft. SAV - Surface Aggregate Visible, from 12 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG45.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES53.1 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES69.5 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES73 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: NO73 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped79.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO81.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: NO81.1 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Capped93.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES117 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - SLUDGE125.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES129.6 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped137.9 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Capped149.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 03 o'clock, , within 8 inches of joint: YES158.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES170.4 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC175.5 ft. MGO - General Observation - CAMERA PROBLEMS179 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Open183.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: YES192 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 12 o'clock, , within 8 inches of joint: NO197.7 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC228 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6" - Open232.5 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES235.8 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Capped248.5 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC248.5 ft. MGO - General Observation - MAG COAT 50% FINISH248.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING BLISTERING CONCRETE248.8 ft. AMH - Downstream Manhole, Survey Ends - 5:20AM

Observation photos (10)

  • General Observation - MAG COAT 50% START 9:00 TO 3:00

    2 ft. - General Observation - MAG COAT 50% START 9:00 TO 3:00

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    6.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Surface Aggregate Visible, from 12 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    33.1 ft. - Surface Aggregate Visible, from 12 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 04 o'clock,  , within 8 inches of joint: YES

    69.5 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

    79.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    170.4 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    197.7 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 04 o'clock,  , within 8 inches of joint: YES

    232.5 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES

Observations (39)

DistanceCodeObservation
2MGOMAG COAT 50% START 9:00 TO 3:00
248.5SAVSEVERE AGG SPORATIC
232.5DAE
2SAVSEVERE AGG SPORATIC
158.3DAE
197.7SAVSEVERE AGG SPORATIC
248.5MGOMAG COAT 50% FINISH
0MWL
53.1DAE
137.9TBCCapped
149.7DAE
248.8AMH5:20AM
170.4SAVSEVERE AGG SPORATIC
79.2SSS
117DSZSLUDGE
6.6SSSPEELING CONCRETE
228TBOpen
192DAE
81.1DAE
81.1TBCCapped
73DAE
0MWM
69.5DAE
235.8TBCCapped
45.7DAE
16.5TBCCapped
93.4DAE
129.6TBCCapped
2SSSPEELING BLISTERING CONCRETE
183.8DAE
33.1SAVSEVERE AGG
0MGOConn. @ Mh, 9 O' Clock. Active
0MGOConn. @ Mh, 3 O' Clock. OPEN
73TBCCapped
125.9DAE
179TBOpen
248.5SSSPEELING BLISTERING CONCRETE
175.5MGOCAMERA PROBLEMS
0AMH2:30AM

Properties (4)

custom_field_three
SEVERE AGG SPORATIC
custom_field_two
3
customer
LACSD
datetime
2016-05-19T02:30:00-07:00