Wastewater/Activity/PacpInspection/1.0May 14, 2016, 10:10 AM
  • C 0307_C 0306_5142016_031844.mp4

Date
05/14/2016
W/O
0563393
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00134
PipeID
P09767
Time
3:10 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H 0131
Sewer Name
C JOINT OUTFALL C - UNIT 6E
City
CERRITOS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
20160514MDM_JOINT_OUTFALL_C_UNIT_6E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
C 0307
Downstream MH
C 0306
Dir. of Survey
Downstream
Length Surveyed
161.7 ft.
Total Length
161.7 ft.
Structural Index
2
Structural Quick
2300
Structural Rating
6
O&M Index
2
O&M Quick
3225
O&M Rating
16
Overall Index
2
Overall Quick
Overall Rating
22
Pipe schematic from manhole C 0307 to C 0306
MH: C 0307MH: C 0306downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:10AM2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE UNDER MAG COAT2.1 ft. MGO - General Observation - MAG COAT 95% START 8:00 TO 4:003.9 ft. IW - Infiltration Weeper, from 11 to 01 o'clock, within 8 inches of joint: NO, Start8.6 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES13.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: NO13.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Capped16.4 ft. IW - Infiltration Weeper, from 11 to 01 o'clock, within 8 inches of joint: NO, Finish21 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active25.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES25.2 ft. MGO - General Observation - MAG COAT 85% START39.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES61 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active73.1 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES73.1 ft. ID - Infiltration Dripper, from 10 to 02 o'clock, within 8 inches of joint: YES145.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES160.5 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: NO161.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING BLISTERING CONCRETE UNDER MAG COAT161.3 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active161.3 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active161.3 ft. MGO - General Observation - MAG COAT 85% FINISH161.7 ft. AMH - Downstream Manhole, Survey Ends - 3:25AM

Observation photos (7)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE UNDER MAG COAT

  • General Observation - MAG COAT 95% START 8:00 TO 4:00

    2.1 ft. - General Observation - MAG COAT 95% START 8:00 TO 4:00

  • Infiltration Weeper, from 11 to 01 o'clock, within 8 inches of joint: NO, Start

    3.9 ft. - Infiltration Weeper, from 11 to 01 o'clock, within 8 inches of joint: NO, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

    25.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

  • General Observation - MAG COAT 85% START

    25.2 ft. - General Observation - MAG COAT 85% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

    39.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    73.1 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

Observations (24)

DistanceCodeObservation
25.2SSS
161.7AMH3:25AM
39.3SSS
25.2MGOMAG COAT 85% START
0MWM
161.3SSSPEELING BLISTERING CONCRETE UNDER MAG COAT
160.5DAGS
8.6DAE
161.3MGOConn. @ Mh, 3 O' Clock. Active
0MWL
16.4IW
2SSSPEELING BLISTERING CONCRETE UNDER MAG COAT
13.2DAE
145.3DAE
73.1DAE
21TBActive
161.3MGOConn. @ Mh, 9 O' Clock. Active
0AMH3:10AM
2.1MGOMAG COAT 95% START 8:00 TO 4:00
13.2TFCCapped
3.9IW
73.1ID
61TBActive
161.3MGOMAG COAT 85% FINISH

Properties (4)

custom_field_three
SPALLING-85% MAG COAT
custom_field_two
4
customer
LACSD
datetime
2016-05-14T03:10:00-07:00