Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 6, 2016, 09:52 AM
Date
05/06/2016
W/O
0571171
Weather
Light Rain
Operator/Surveyor
MARTIN
Sewer ID
Z00509
PipeID
P07339
Time
2:52 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Heavy Cleaning
Media Label
G6701
Sewer Name
05 PRAIRIE AVENUE TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
07
Purpose
Maintenance Related
Project
20160506MDM_PRAIRIE_AVENUE_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Upstream MH
05 2195
Downstream MH
05 2194
Dir. of Survey
Downstream
Length Surveyed
384.6 ft.
Total Length
384.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2O00
O&M Rating
158
Overall Index
2
Overall Quick
Overall Rating
158
Pipe schematic from manhole 05 2195 to 05 2194
MH: 05 2195MH: 05 2194downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:25AM0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. MGP - General Photograph2 ft. DAGS - Deposits Attached Grease, 8 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start17.8 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO21.2 ft. DAGS - Deposits Attached Grease, 2 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start21.2 ft. DAGS - Deposits Attached Grease, 8 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish291.2 ft. DAGS - Deposits Attached Grease, 2 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES384.1 ft. DAGS - Deposits Attached Grease, 2 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish384.6 ft. AMH - Downstream Manhole, Survey Ends - 5:45AM

Observation photos (5)

  • General Photograph

    2 ft. - General Photograph

  • Deposits Attached Grease, 8 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 8 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: NO

    17.8 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO

  • Deposits Attached Grease, 2 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    21.2 ft. - Deposits Attached Grease, 2 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 2 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES

    291.2 ft. - Deposits Attached Grease, 2 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES

Observations (11)

DistanceCodeObservation
0MWL
2MGP
384.1DAGS
21.2DAGS
0AMH5:25AM
21.2DAGS
2DAGS
17.8DAGS
291.2DAGS
0MWM
384.6AMH5:45AM

Properties (2)

customer
LACSD
datetime
2016-05-06T02:52:35-07:00