C 0310_C 0309_562016_095257.mp4
0 ft. - Water Level, 30 %of cross sectional area
0 ft. - Water Mark, 40 %of cross sectional area
0 ft. - Upstream Manhole, Survey Begins - 9:51 AM
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start
284.8 ft. - Tap Break-In Intruding, at 02 o'clock, -, -, within 8 inches of joint: NO, 6", 1 1/2" - ACTIVE
445.4 ft. - Deposits Attached Encrustation, 10 %-15% of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES
445.4 ft. - Material Change, Vitrified clay pipe
| Distance | Code | Observation |
|---|---|---|
| 445.6 | MGO | ACTIVE CONN. INSIDE THE MH. @ 01 O'CLOCK |
| 300.1 | TB | OPEN |
| 445.4 | SAV | — |
| 2 | SAV | — |
| 0 | MWL | — |
| 445.4 | SSS | — |
| 0 | MWM | — |
| 445.4 | DAE | — |
| 445.6 | MGO | ACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK |
| 445.4 | MMC | — |
| 284.8 | TBI | ACTIVE |
| 0 | AMH | 9:51 AM |
| 2 | SSS | — |
| 445.8 | AMH | 10:24 AM |
| 157.7 | TF | OPEN |