2 ft. - General Observation - MISSING TILES 100% START
2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
5 ft. - General Observation - MISSING TILES 5% UNDER MAG COAT
5 ft. - General Observation - MAG COAT 90% 9:00 TO 3:00 START
11.8 ft. - Surface Spalling, from 11 to 12 o'clock, within 8 inches of joint: NO - AREA OF MISSING TILE
20.5 ft. - General Observation - POSSIBLE MISSING TILES 100% UNDER MAG COAT
24 ft. - General Observation - MISSING TILES 100% UNDER MAGH FINISH
34.7 ft. - General Observation - MISSING TLIES 30% UNDER MAG COAT START
50.6 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES
96.7 ft. - General Observation - TILES IN PLACE UNDER MAG COAT
104.8 ft. - Deposits Settled Other, 40 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start - TILES AND DEBRIE
| Distance | Code | Observation |
|---|---|---|
| 119 | SAV | SEVERE AGG AREAS OF MISSING TILES |
| 119 | MGO | MISSING TILES 30% FINISH |
| 96.7 | MGO | TILES IN PLACE UNDER MAG COAT |
| 120 | AMH | 1:45AM |
| 0 | MWL | — |
| 20.5 | MGO | POSSIBLE MISSING TILES 100% UNDER MAG COAT |
| 119 | MGO | MH CONN OPEN 3:00 |
| 50.6 | SAV | SEVERE AGG AREAS OF MISSING TILES |
| 5 | MGO | MISSING TILES 5% UNDER MAG COAT |
| 119 | DSZ | TILES & DEBRIE |
| 24 | MGO | MISSING TILES 100% UNDER MAGH FINISH |
| 34.7 | MGO | MISSING TLIES 30% UNDER MAG COAT START |
| 2 | MGO | MISSING TILES 100% START |
| 11.8 | SSS | AREA OF MISSING TILE |
| 0 | AMH | 1:15AM |
| 104.8 | DSZ | TILES AND DEBRIE |
| 5 | MGO | MISSING TILES 100% FINISH |
| 2 | SAM | SEVERE AGG |
| 5 | MGO | MAG COAT 90% 9:00 TO 3:00 START |
| 0 | MWM | — |
| 5 | SAM | SEVERE AGG |