Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 2, 2016, 03:56 PM
  • 18 0044_18 0043_522016_090131.mp4

Date
05/02/2016
W/O
0563300
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00689
PipeID
P13859
Time
8:56 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7104
Sewer Name
18 MILLS AVENUE TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
20160428AM_MILLS_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
12 in.
Upstream MH
18 0044
Downstream MH
18 0043
Dir. of Survey
Downstream
Length Surveyed
352.2 ft.
Total Length
352.2 ft.
Structural Index
3
Structural Quick
4131
Structural Rating
9
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 18 0044 to 18 0043
MH: 18 0044MH: 18 0043downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 9:00 AM0 ft. MGO - General Observation - ROACHES INSIDE THE MH.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start21.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"27.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"66.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES70.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"76.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"127.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"134.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"185.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"195 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"246.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"252.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"304.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"310.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"350.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish350.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish351.2 ft. MGO - General Observation - ROACHES INSIDE THE MH.352.2 ft. AMH - Downstream Manhole, Survey Ends - 9:32 AM

Observation photos (4)

  • Water Mark, 25 %of cross sectional area

    0 ft. - Water Mark, 25 %of cross sectional area

  • Upstream Manhole, Survey Begins - 9:00 AM

    0 ft. - Upstream Manhole, Survey Begins - 9:00 AM

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    66.3 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (23)

DistanceCodeObservation
134.1TFC
27.8TFC
195TFC
0MWL
351.2MGOROACHES INSIDE THE MH.
21.2TFC
127.9TFC
304.1TFC
70.7TFC
252.6TFC
0MWM
185.8TFC
66.3FM
310.3TFC
0AMH9:00 AM
246.4TFC
350.3SAV
76.5TFC
352.2AMH9:32 AM
350.3SSS
2SAV
0MGOROACHES INSIDE THE MH.
2SSS

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2016-05-02T08:56:20-07:00