2 ft. - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - General Observation - MAG COAT 30% START 9:00 TO 3:00
2 ft. - Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT SPORATIC
20.3 ft. - Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: NO
20.3 ft. - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: NO
22.9 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVER AGG UNDER MAG COAT
46.4 ft. - General Observation - MAG COAT 10% START
73 ft. - Water Mark, 50 %of cross sectional area
98.4 ft. - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: NO
179.6 ft. - Water Mark, 30 %of cross sectional area
| Distance | Code | Observation |
|---|---|---|
| 303.3 | SAP | SEVERE AGG |
| 22.9 | SAV | SEVER AGG UNDER MAG COAT |
| 303.7 | AMH | 3:20AM |
| 46.4 | MGO | MAG COAT 10% START |
| 179.6 | MWM | — |
| 303.3 | MGO | MAG COAT 40% FINISH |
| 2 | SAP | SEVERE AGG |
| 2 | MGO | MAG COAT 30% START 9:00 TO 3:00 |
| 20.3 | SAP | — |
| 2 | SAP | SEVERE AGG |
| 216.3 | MGO | MAG COAT 40% START |
| 303.3 | SAV | SEVERE AGG SPORATIC |
| 0 | MGO | MH CONN ACTIVE 3:00 |
| 73 | MWM | — |
| 303.3 | MGO | MAN CONN 3:00 ACTIVE |
| 98.4 | SAP | — |
| 0 | AMH | 2:40AM |
| 303.3 | SAP | SEVERE AGG |
| 2 | SAV | SEVERE AGG UNDER MAG COAT SPORATIC |
| 0 | MWL | — |
| 20.3 | SAP | — |