Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 19, 2016, 08:02 AM
Date
04/19/2016
W/O
0557617
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01124
PipeID
P13720
Time
1:02 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6693
Sewer Name
B JOINT OUTFALL B - UNIT 6G
City
ALHAMBRA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
02
Purpose
Routine Assessment
Project
20160415MDM_JOINT_OUTFALL_B_UNIT_6G
Material
NRCP
Shape
Circular
Height
36 in.
Upstream MH
B 1095
Downstream MH
B 1094
Dir. of Survey
Downstream
Length Surveyed
831.5 ft.
Total Length
831.5 ft.
Structural Index
3
Structural Quick
3›00
Structural Rating
1377
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
1377
Pipe schematic from manhole B 1095 to B 1094
MH: B 1095MH: B 1094downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:30AM2 ft. SAP - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. MGO - General Observation - MAG COAT 90% START 9:00 TO 3:002 ft. SAP - Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG147 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC285.3 ft. MGO - General Observation - MAG COAT 80% START285.3 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG UNDER MAG COAT674.6 ft. SAP - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG674.6 ft. SAP - Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG796.5 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG796.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG796.5 ft. MWL - Water Level, 30 %of cross sectional area796.5 ft. SAP - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVER AGG796.5 ft. SAP - Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: YES, Finish - SEVER AGG796.5 ft. MWL - Water Level, 60 %of cross sectional area802.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG831.2 ft. MGO - General Observation - MH CONN ACTIVE 3:00831.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG831.5 ft. AMH - Downstream Manhole, Survey Ends - 2:30AM

Observation photos (10)

  • Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - MAG COAT 90% START 9:00 TO 3:00

    2 ft. - General Observation - MAG COAT 90% START 9:00 TO 3:00

  • Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    147 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • General Observation - MAG COAT 80% START

    285.3 ft. - General Observation - MAG COAT 80% START

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG UNDER MAG COAT

    285.3 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG UNDER MAG COAT

  • Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

    674.6 ft. - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

    674.6 ft. - Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    796.5 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    802.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (21)

DistanceCodeObservation
796.5SAVSEVERE AGG
285.3MGOMAG COAT 80% START
802.2SAPSEVERE AGG
2SAPSEVERE AGG
2MGOMAG COAT 90% START 9:00 TO 3:00
796.5SAPSEVERE AGG
285.3SAVSEVERE AGG UNDER MAG COAT
831.2MGOMH CONN ACTIVE 3:00
674.6SAPSEVERE AGG
674.6SAPSEVERE AGG
0MWL
2SAPSEVERE AGG
831.2SAPSEVERE AGG
796.5MWL
0MWM
147SAVSEVERE AGG SPORATIC
796.5SAPSEVER AGG
0AMH1:30AM
796.5SAPSEVER AGG
831.5AMH2:30AM
796.5MWL

Properties (4)

custom_field_three
PROJECTING SEVERE AGG
custom_field_two
2
customer
LACSD
datetime
2016-04-19T01:02:28-07:00