Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 14, 2016, 09:02 AM
Date
04/14/2016
W/O
0552359
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00105
PipeID
P09177
Time
2:02 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6690
Sewer Name
B JOINT OUTFALL B - UNIT 8B
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
20160413MDM_JOINT_OUTFALL_B_UNIT_8B
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
B 0605
Downstream MH
B 0604
Dir. of Survey
Downstream
Length Surveyed
176.5 ft.
Total Length
176.5 ft.
Structural Index
2
Structural Quick
2F00
Structural Rating
70
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
70
Pipe schematic from manhole B 0605 to B 0604
MH: B 0605MH: B 0604downstream0 ft. MGO - General Observation - MH CONN ACTIVE 9:000 ft. MGO - General Observation - MH CONN OPEN 3:000 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:35AM0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 80% 8:00 TO 4:00 START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING LAITANCE COAT UNDER MAG COAT23 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN176.1 ft. MGO - General Observation - MH CONN OPEN 9:00176.1 ft. MGO - General Observation - MAG COAT 80% FINISH176.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING LAITANCE COAT UNDER MAG COAT176.5 ft. AMH - Downstream Manhole, Survey Ends - 4:50AM

Observation photos (2)

  • General Observation - MAG COAT 80% 8:00 TO 4:00 START

    2 ft. - General Observation - MAG COAT 80% 8:00 TO 4:00 START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING LAITANCE COAT UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING LAITANCE COAT UNDER MAG COAT

Observations (12)

DistanceCodeObservation
0MGOMH CONN ACTIVE 9:00
176.1MGOMH CONN OPEN 9:00
0MGOMH CONN OPEN 3:00
2MGOMAG COAT 80% 8:00 TO 4:00 START
23TFOPEN
176.5AMH4:50AM
0MWL
176.1MGOMAG COAT 80% FINISH
0AMH4:35AM
2SSSPEELING LAITANCE COAT UNDER MAG COAT
176.1SSSPEELING LAITANCE COAT UNDER MAG COAT
0MWM

Properties (4)

custom_field_three
PEELING LAITANCE COAT-80% MAG COAT
custom_field_two
4
customer
LACSD
datetime
2016-04-14T02:02:24-07:00