Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 14, 2016, 09:01 AM
Date
04/14/2016
W/O
0552359
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00105
PipeID
P09178
Time
2:01 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6690
Sewer Name
B JOINT OUTFALL B - UNIT 8B
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
20160413MDM_JOINT_OUTFALL_B_UNIT_8B
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
B 0606
Downstream MH
B 0605
Dir. of Survey
Downstream
Length Surveyed
396.7 ft.
Total Length
396.7 ft.
Structural Index
2
Structural Quick
2O00
Structural Rating
160
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
160
Pipe schematic from manhole B 0606 to B 0605
MH: B 0606MH: B 0605downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - MH CONN ACTIVE 9:000 ft. AMH - Upstream Manhole, Survey Begins - 3:55AM0 ft. MGO - General Observation - MH CONN OPEN 3:002 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING LAITANCE COAT UNDER MAG COAT2 ft. MGO - General Observation - MG COAT 80% START 8:00 TO 4:00220.6 ft. SSS - Surface Spalling, from 08 to 10 o'clock, within 8 inches of joint: YES - PEELING LAITANCE COAT396.2 ft. MGO - General Observation - MAG COAT 80% FINISH396.2 ft. MGO - General Observation - MH CONN OPEN 3:00396.2 ft. MGO - General Observation - MH CONN ACTIVE 9:00396.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING LAITANCE COAT UNDER MAG COAT396.7 ft. AMH - Downstream Manhole, Survey Ends - 4:20AM

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING LAITANCE COAT UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING LAITANCE COAT UNDER MAG COAT

  • General Observation - MG COAT 80% START 8:00 TO 4:00

    2 ft. - General Observation - MG COAT 80% START 8:00 TO 4:00

  • Surface Spalling, from 08 to 10 o'clock, within 8 inches of joint: YES - PEELING LAITANCE COAT

    220.6 ft. - Surface Spalling, from 08 to 10 o'clock, within 8 inches of joint: YES - PEELING LAITANCE COAT

Observations (13)

DistanceCodeObservation
396.2MGOMAG COAT 80% FINISH
0MWL
0MWM
0MGOMH CONN ACTIVE 9:00
220.6SSSPEELING LAITANCE COAT
2SSSPEELING BLISTERING LAITANCE COAT UNDER MAG COAT
0AMH3:55AM
396.2MGOMH CONN OPEN 3:00
396.2MGOMH CONN ACTIVE 9:00
396.7AMH4:20AM
0MGOMH CONN OPEN 3:00
396.2SSSPEELING LAITANCE COAT UNDER MAG COAT
2MGOMG COAT 80% START 8:00 TO 4:00

Properties (4)

custom_field_three
PEELING LAITANCE COAT -80% MAG COAT
custom_field_two
4
customer
LACSD
datetime
2016-04-14T02:01:34-07:00