Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 13, 2016, 08:14 AM
Date
04/13/2016
W/O
0552359
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00105
PipeID
P09185
Time
1:14 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6688
Sewer Name
B JOINT OUTFALL B - UNIT 8B
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
20160413MDM_JOINT_OUTFALL_B_UNIT_8B
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
B 0613
Downstream MH
B 0612
Dir. of Survey
Downstream
Length Surveyed
368.7 ft.
Total Length
368.7 ft.
Structural Index
3
Structural Quick
3O2N
Structural Rating
380
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
380
Pipe schematic from manhole B 0613 to B 0612
MH: B 0613MH: B 0612downstream0 ft. AMH - Upstream Manhole, Survey Begins - 1:15AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - MH CONN ACTIVE 3:000 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING LAITANCE COAT11 ft. MGO - General Observation - MAG COAT 25% 8:00 TO 4:0021.5 ft. MGO - General Observation - MAG COAT 85% START 8:00 TO 4:0038.4 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG38.4 ft. SAV - Surface Aggregate Visible, from 01 to 02 o'clock, within 8 inches of joint: NO - SEV ERE AGG85.9 ft. SAV - Surface Aggregate Visible, from 10 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG UNDERE MAG COAT95.1 ft. MGP - General Photograph125.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG164.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE314.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG368.3 ft. MGO - General Observation - MH CONN OPEN 9:00368.3 ft. MGO - General Observation - MAG COAT 85% FINISH368.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING LAITANCE COAT368.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG UNDER MAG COAT368.7 ft. AMH - Downstream Manhole, Survey Ends - 2:05AM

Observation photos (10)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start  - SEVERE AGG

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING LAITANCE COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING LAITANCE COAT

  • General Observation - MAG COAT 25% 8:00 TO 4:00

    11 ft. - General Observation - MAG COAT 25% 8:00 TO 4:00

  • General Observation - MAG COAT 85% START 8:00 TO 4:00

    21.5 ft. - General Observation - MAG COAT 85% START 8:00 TO 4:00

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG

    38.4 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 01 to 02 o'clock, within 8 inches of joint: NO - SEV ERE AGG

    38.4 ft. - Surface Aggregate Visible, from 01 to 02 o'clock, within 8 inches of joint: NO - SEV ERE AGG

  • Surface Aggregate Visible, from 10 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG UNDERE MAG COAT

    85.9 ft. - Surface Aggregate Visible, from 10 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG UNDERE MAG COAT

  • General Photograph

    95.1 ft. - General Photograph

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    125.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    314.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

Observations (20)

DistanceCodeObservation
368.3MGOMH CONN OPEN 9:00
368.3MGOMAG COAT 85% FINISH
0AMH1:15AM
38.4SAVSEVERE AGG
0MWL
368.3SSSBLISTERING PEELING LAITANCE COAT
21.5MGOMAG COAT 85% START 8:00 TO 4:00
38.4SAVSEV ERE AGG
164.5TFACTIVE
314.6SAVSEVERE AGG
0MGOMH CONN ACTIVE 3:00
368.3SAVSEVERE AGG UNDER MAG COAT
0MWM
2SAVSEVERE AGG
85.9SAVSEVERE AGG UNDERE MAG COAT
2SSSBLISTERING PEELING LAITANCE COAT
11MGOMAG COAT 25% 8:00 TO 4:00
95.1MGP
125.6SAVSEVERE AGG
368.7AMH2:05AM

Properties (4)

custom_field_three
SEVERE AGG VISIBLE
custom_field_two
3
customer
LACSD
datetime
2016-04-13T01:14:52-07:00