Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 1, 2016, 11:12 AM
  • 05 1083_05 1082_412016_043845.mp4

Date
04/01/2016
W/O
0557603
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00488
PipeID
P06317
Time
4:12 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0107
Sewer Name
05 MONETA EXTENSION TRUNK, SECTION 1
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
18
Purpose
Routine Assessment
Project
20160401MDM_MONETA_EXTENSION_TRUNK_SECTION_1
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Upstream MH
05 1083
Downstream MH
05 1082
Dir. of Survey
Downstream
Length Surveyed
325.5 ft.
Total Length
325.5 ft.
Structural Index
2
Structural Quick
2211
Structural Rating
5
O&M Index
2
O&M Quick
2400
O&M Rating
8
Overall Index
2
Overall Quick
Overall Rating
13
Pipe schematic from manhole 05 1083 to 05 1082
MH: 05 1083MH: 05 1082downstream0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 4:20AM0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 04 o'clock, , within 8 inches of joint: NO2.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start40.6 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES59.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"66.6 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES78.6 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES84.9 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES162.4 ft. CC - Crack Circumferential, from 02 to 03 o'clock, within 8 inches of joint: YES167.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"198.7 ft. MGO - General Observation - 24" VCP325 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish325 ft. MGO - General Observation - MH CONN OPEN 9:00325 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active325.5 ft. AMH - Downstream Manhole, Survey Ends - 4:45AM

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - 24" VCP

    198.7 ft. - General Observation - 24" VCP

Observations (18)

DistanceCodeObservation
40.6DSGV
325DAGS
0MGOConn. @ Mh, 9 O' Clock. Active
2DAGS
84.9DSGV
325MGOMH CONN OPEN 9:00
325.5AMH4:45AM
78.6CL
59.7TFC
325MGOConn. @ Mh, 3 O' Clock. Active
2.9DAGS
0AMH4:20AM
0MWM
162.4CC
0MWL
167.9TFC
198.7MGO24" VCP
66.6CL

Properties (3)

custom_field_two
4
customer
LACSD
datetime
2016-04-01T04:12:25-07:00