Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 31, 2016, 07:28 AM
  • 05 2490_05 1090_3312016_004404.mp4

Date
03/31/2016
W/O
0557603
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00488
PipeID
P06325
Time
12:28 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0104
Sewer Name
05 MONETA EXTENSION TRUNK, SECTION 1
City
LAWNDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
18
Purpose
Routine Assessment
Project
20160325MDM_MONETA_EXTENSION_TRUNK_SECTION_1
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Upstream MH
05 2490
Downstream MH
05 1090
Dir. of Survey
Downstream
Length Surveyed
408.5 ft.
Total Length
408.5 ft.
Structural Index
2
Structural Quick
2512
Structural Rating
12
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
16
Pipe schematic from manhole 05 2490 to 05 1090
MH: 05 2490MH: 05 1090downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12:30AM0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area9.6 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - ROCK15.7 ft. FC - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES - HAIRLINE57.1 ft. FC - Fracture Circumferential, from 08 to 10 o'clock, within 8 inches of joint: YES - H65.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"94.1 ft. CC - Crack Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES154 ft. CC - Crack Circumferential, from 12 to 01 o'clock, within 8 inches of joint: YES166.5 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES174.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"174.8 ft. MGO - General Observation - 24" VCP275.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"282.5 ft. FC - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES - H287.3 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - ROCK343 ft. FC - Fracture Circumferential, from 08 to 09 o'clock, within 8 inches of joint: YES - H377.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"408.5 ft. AMH - Downstream Manhole, Survey Ends - 1:10AM

Observation photos (1)

  • General Observation - 24" VCP

    174.8 ft. - General Observation - 24" VCP

Observations (19)

DistanceCodeObservation
166.5CL
65.4TFC
9.6DSZROCK
377.5TFC
0AMH12:30AM
0MGOConn. @ Mh, 3 O' Clock. Active
282.5FCH
94.1CC
287.3DSZROCK
0MWL
275.8TFC
15.7FCHAIRLINE
174.8MGO24" VCP
154CC
174.6TFC
0MWM
57.1FCH
408.5AMH1:10AM
343FCH

Properties (3)

custom_field_two
4
customer
LACSD
datetime
2016-03-31T00:28:48-07:00