2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING LAITANCE COAT
4.9 ft. - Surface Spalling, from 01 to 04 o'clock, within 8 inches of joint: YES - BLISTERING LAITANCE COAT
16.9 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - ROCKS
41.6 ft. - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC
143.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT
194.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES
223.4 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - ROCK
408.4 ft. - General Observation - MH CONN ACTIVE 9:00
| Distance | Code | Observation |
|---|---|---|
| 408.4 | SSS | PEELING BLISTERING LAITANCE COAT |
| 0 | MWM | — |
| 301 | MWL | — |
| 2 | SSS | PEELING BLISTERING LAITANCE COAT |
| 0 | MGO | MH CONN STUB 9:00 |
| 0 | AMH | 3:50AM |
| 143.6 | SSS | BLISTERING LAITANCE COAT |
| 194.4 | SSS | — |
| 16.9 | DSZ | ROCKS |
| 41.6 | SAV | SEVERE AGG SPORATIC |
| 408.8 | AMH | 4:30AM |
| 223.4 | DSZ | ROCK |
| 4.9 | SSS | BLISTERING LAITANCE COAT |
| 408.4 | MGO | MH CONN ACTIVE 9:00 |
| 0 | MWL | — |