2 ft. - General Observation - MAG COAT 70% START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING LAITANCE COAT
65.7 ft. - Surface Spalling, from 01 to 04 o'clock, within 8 inches of joint: NO
92.3 ft. - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: YES
117.1 ft. - General Observation - MAG COAT 50% START
121.5 ft. - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG
261.9 ft. - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC
287.9 ft. - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 65.7 | SSS | — |
| 287.9 | SSS | — |
| 0 | AMH | 2:45AM |
| 362.3 | MGO | MAG COAT 50% FINISH |
| 121.5 | SAV | SEVERE AGG |
| 92.3 | SSS | — |
| 362.6 | AMH | 3:20AM |
| 362.3 | MGO | MH CONN STUB 3:00 |
| 261.9 | SAV | SEVERE AGG SPORATIC |
| 362.3 | MGO | MH CONN OPEN 9:00 |
| 2 | MGO | MAG COAT 70% START |
| 117.1 | MGO | MAG COAT 50% START |
| 362.3 | SSS | PEELING BLISTERING LAITANCE COAT |
| 2 | SSS | PEELING BLISTERING LAITANCE COAT |
| 0 | MGO | MH CONN STUB 9:00 |
| 0 | MGO | MH CONN STUB 3:00 |