Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 12, 2016, 12:42 PM
  • 05 0379_05 0378_2122016_044824.mp4

Date
02/12/2016
W/O
0536428
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00432
PipeID
P05591
Time
4:42 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0051
Sewer Name
05 DISTRICT #5 MAIN RELIEF TRUNK
City
HAWTHORNE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
10
Purpose
Routine Assessment
Project
20160212MDM_DISTRICT_5_MAIN_RELIEF_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
05 0379
Downstream MH
05 0378
Dir. of Survey
Downstream
Length Surveyed
450.6 ft.
Total Length
450.6 ft.
Structural Index
3
Structural Quick
3A23
Structural Rating
42
O&M Index
4
O&M Quick
4131
O&M Rating
7
Overall Index
3
Overall Quick
Overall Rating
49
Pipe schematic from manhole 05 0379 to 05 0378
MH: 05 0379MH: 05 0378downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - SLUDGE0 ft. AMH - Upstream Manhole, Survey Begins - 4:45AM0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING LAITANCE COAT BOTTOM MH8 ft. SSS - Surface Spalling, from 09 to 11 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT11.4 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG15.6 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Finish85.5 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG SPORATIC88.5 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO, Finish114.6 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG119.9 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Finish143.4 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG153 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Finish180.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO184 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG197.5 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG206.7 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Finish219.6 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC224.2 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG227.6 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE SPORATIC232.8 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG285 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO398 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG438 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Finish450.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish450.6 ft. AMH - Downstream Manhole, Survey Ends - 5:25AM

Observation photos (15)

  • Deposits Settled Other,  10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: NO - SLUDGE

    0 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - SLUDGE

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING LAITANCE COAT BOTTOM MH

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING LAITANCE COAT BOTTOM MH

  • Surface Spalling, from 09 to 11 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT

    8 ft. - Surface Spalling, from 09 to 11 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    11.4 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG SPORATIC

    85.5 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    114.6 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Finish

    119.9 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Finish

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    143.4 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

    180.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG

    184 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    197.5 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC

    219.6 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    232.8 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO

    285 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG

    398 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG

Observations (28)

DistanceCodeObservation
206.7SAV
227.6SAVSEVERE SPORATIC
180.9SSS
285SAV
0MWM
88.5SAV
224.2SAVSEVERE AGG
450.6AMH5:25AM
11.4SAVSEVERE AGG
219.6SAVSEVERE AGG SPORATIC
0MGOConn. @ Mh, 3 O' Clock. Active
438SAV
2SSSPEELING BLISTERING LAITANCE COAT BOTTOM MH
15.6SAV
8SSSBLISTERING LAITANCE COAT
197.5SAVSEVERE AGG
0DSZSLUDGE
232.8SAVSEVERE AGG
0AMH4:45AM
85.5SAVSEVERE AGG SPORATIC
0MWL
143.4SAVSEVERE AGG
398SAVSEVERE AGG
119.9SAV
153SAV
450.3SSS
184SAVSEVERE AGG
114.6SAVSEVERE AGG

Properties (4)

custom_field_three
SEVERE AGG VISIBLE
custom_field_two
3
customer
LACSD
datetime
2016-02-12T04:42:18-08:00