05 2159_05 2097_1262016_021252.mp4
0 ft. - General Observation - MAG COAT 80% START 9:00 TO 3:00
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT SWOLLEN BLISTERING
2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
17.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - LAITANCE COAT BLISTERING UNDER MAG COAT
223.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO
394.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | LAITANCE COAT SWOLLEN BLISTERING |
| 2 | DAGS | — |
| 0 | MGO | MAG COAT 80% START 9:00 TO 3:00 |
| 223.1 | SSS | — |
| 0 | AMH | 1:45AM |
| 394.8 | SSS | — |
| 424.9 | AMH | 2:20AM |
| 424.4 | DAGS | — |
| 0 | MWM | — |
| 0 | MWL | — |
| 17.9 | SSS | LAITANCE COAT BLISTERING UNDER MAG COAT |
| 424.4 | SSS | — |
| 424.4 | MGO | MAG COAT 80% FINISH |