05 2160_05 2159_1252016_051906.mp4
0 ft. - General Observation - MAG COAT 95% START 9:00 TO 3:00
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT SWOLLEN BLISTERING
2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
29.8 ft. - General Observation - MAG COAT 70% START
39.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES
46.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO
84.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - SWOLLEN BLISTERING LAITANCE COAT UNDER MAG COAT
172.8 ft. - Surface Spalling, at 03 o'clock, within 8 inches of joint: NO
251.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 84.4 | SSS | SWOLLEN BLISTERING LAITANCE COAT UNDER MAG COAT |
| 39.9 | SSS | — |
| 29.8 | MGO | MAG COAT 70% START |
| 251.7 | SSS | — |
| 2 | SSS | LAITANCE COAT SWOLLEN BLISTERING |
| 46.7 | SSS | — |
| 445.3 | MGO | MAG COAT 70% FINISH |
| 445.3 | SSS | — |
| 172.8 | SSS | — |
| 0 | MWL | — |
| 445.8 | AMH | 5:45AM |
| 0 | MWM | — |
| 0 | AMH | 5:15AM |
| 2 | DAGS | — |
| 445.3 | DAGS | — |
| 29.8 | TB | Open |
| 0 | MGO | MAG COAT 95% START 9:00 TO 3:00 |