2 ft. - General Observation - MAG COAT 80% START 9:00 TO 3:00
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING BLISTERING UNDER MAG COAT
2 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
16.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO
43.6 ft. - General Observation - MAG COAT 95% START
102.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO
192.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES
354.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO
518 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES
639.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 5:35AM |
| 0 | MWL | — |
| 518 | SSS | — |
| 670.2 | SSS | LAITANCE COAT BLISTERING UNDER MAG COAT |
| 639.8 | SSS | — |
| 2 | MGO | MAG COAT 80% START 9:00 TO 3:00 |
| 192.9 | SSS | — |
| 670.2 | MGO | MAG COAT 95% FINISH |
| 2 | SSS | LAITANCE COAT PEELING BLISTERING UNDER MAG COAT |
| 2 | DAGS | — |
| 102.8 | SSS | — |
| 670.8 | AMH | 6:15AM |
| 43.6 | MGO | MAG COAT 95% START |
| 354.5 | SSS | — |
| 16.7 | SSS | — |
| 0 | MWM | — |
| 670.2 | DAGS | — |