05 2168_05 2167_1212016_030119.mp4
2 ft. - General Observation - MAG COAT 80% START 9:00 TO 3:00
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING BLISTERING UNDER MAG COAT
2 ft. - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
23.7 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO
26 ft. - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO
73.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES
404.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO
470.9 ft. - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO
526.6 ft. - Water Mark, 80 %of cross sectional area
576.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 73.4 | SSS | — |
| 26 | DAGS | — |
| 526.6 | MWM | — |
| 2 | MGO | MAG COAT 80% START 9:00 TO 3:00 |
| 608.6 | AMH | 3:20AM |
| 23.7 | SSS | — |
| 2 | SSS | LAITANCE COAT PEELING BLISTERING UNDER MAG COAT |
| 0 | AMH | 2:45AM |
| 2 | DAGS | — |
| 470.9 | DAGS | — |
| 404.9 | SSS | — |
| 608.2 | SSS | — |
| 576.9 | SSS | — |
| 608.2 | DAGS | — |
| 608.2 | MGO | MAG COAT 80% FINISH |
| 0 | MWM | — |
| 0 | MWL | — |