05 2169_05 2168_1212016_021100.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELIN BLLISTERING UNDER MAG COAT
2 ft. - Deposits Attached Grease, 25%of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
2 ft. - General Observation - MAG COAT 90% START 9:00 TO 3:00
8 ft. - General Photograph - GREASE
42.5 ft. - Water Mark, 90 %of cross sectional area
51.5 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - LAITACE COAT BLISTERING
313.2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - LAITANCE COAT SWOLLEN
465.4 ft. - Surface Spalling, from 01 to 02 o'clock, within 8 inches of joint: YES - BLISTERING LAITANCE COAT
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | LAITANCE COAT PEELIN BLLISTERING UNDER MAG COAT |
| 8 | MGP | GREASE |
| 313.2 | SSS | LAITANCE COAT SWOLLEN |
| 42.5 | MWM | — |
| 0 | MWM | — |
| 545.7 | AMH | 2:35AM |
| 0 | MWL | — |
| 2 | DAGS | — |
| 2 | MGO | MAG COAT 90% START 9:00 TO 3:00 |
| 545.1 | SSS | — |
| 545.1 | MGO | MAG COAT 90% FINISH |
| 465.4 | SSS | BLISTERING LAITANCE COAT |
| 0 | AMH | 1:50AM |
| 51.5 | SSS | LAITACE COAT BLISTERING |
| 545.1 | DAGS | — |