05 0636_05 0635_1202016_031744.mp4
2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING BLISTERING UNDER MAG COAT
2 ft. - General Observation - MAG COAT 95% START 9:00 TO 3:00
5.7 ft. - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: NO
37.4 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES
177.6 ft. - Water Mark, 70 %of cross sectional area
422.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - LAITANCE COAT BLISTERING UNDER MAG COAT
| Distance | Code | Observation |
|---|---|---|
| 620.2 | MGO | MAG COAT 90-% FINISH |
| 422.3 | SSS | LAITANCE COAT BLISTERING UNDER MAG COAT |
| 2 | DAGS | — |
| 5.7 | SSS | — |
| 488.4 | MWL | — |
| 620.7 | AMH | 4:15AM |
| 0 | AMH | 3:00AM |
| 37.4 | DAGS | — |
| 620.2 | SSS | — |
| 0 | MWL | — |
| 2 | SSS | LAITANCE COAT PEELING BLISTERING UNDER MAG COAT |
| 2 | MGO | MAG COAT 95% START 9:00 TO 3:00 |
| 37.4 | DAGS | — |
| 177.6 | MWM | — |
| 0 | MWM | — |