18 0304_18 0303_1142016_014740.mp4
2 ft. - General Observation - MAG COAT 98% START 8:00 TO 4:00
40.8 ft. - Surface Aggregate Visible, from 11 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG
100.8 ft. - Surface Reinforcement Visible, from 12 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
101.8 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG
259.9 ft. - Repair Patch, from 09 to 10 o'clock, within 8 inches of joint: YES - 6" X6"
260.6 ft. - Repair Patch, from 09 to 10 o'clock, within 8 inches of joint: YES - 6" X6"
260.6 ft. - Repair Patch, from 09 to 10 o'clock, within 8 inches of joint: YES - 6" X6" TOP
260.6 ft. - Repair Patch, from 09 to 10 o'clock, within 8 inches of joint: YES - 6" X6" BOTTOM
261.6 ft. - Repair Patch, from 09 to 10 o'clock, within 8 inches of joint: YES - 6" X6"
271.4 ft. - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
294.5 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - ROCKS
332.9 ft. - Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG& PEELING CONCRETE
386.7 ft. - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - CIRCUM REBAR-PEELING CONCRETE
399.2 ft. - Surface Aggregate Visible, from 12 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 2 | MGO | MAG COAT 98% START 8:00 TO 4:00 |
| 405.4 | MGO | MAG COAT 98% FINISH |
| 405.8 | AMH | 2:45AM |
| 238.4 | TF | Open |
| 181.9 | TB | Open |
| 154 | DSZ | ROCK |
| 48.1 | DSGV | — |
| 399.2 | SAV | SEVERE AGG |
| 0 | AMH | 1:40AM |
| 376.2 | TFC | Capped |
| 260.6 | RPP | 6" X6" |
| 260.6 | RPP | 6" X6" TOP |
| 260.6 | RPP | 6" X6" BOTTOM |
| 40.8 | SAV | SEVERE AGG |
| 327.3 | TFC | Capped |
| 91.7 | DSGV | — |
| 26.8 | DSZ | ROCKS |
| 279.3 | TFC | Capped |
| 100.8 | SRV | CIRCUM REBAR |
| 294.5 | DSZ | ROCKS |
| 405.4 | DSZ | ROCKS |
| 261.6 | RPP | 6" X6" |
| 271.4 | SRV | CIRCUM REBAR |
| 36.7 | TFC | Capped |
| 0 | MWM | — |
| 0 | MWL | — |
| 84.9 | TFC | Capped |
| 133.5 | TFC | Capped |
| 213.7 | DSZ | ROCKS |
| 386.7 | SRV | CIRCUM REBAR-PEELING CONCRETE |
| 259.9 | RPP | 6" X6" |
| 101.8 | SAV | SEVERE AGG |
| 332.9 | SAV | SEVERE AGG& PEELING CONCRETE |