Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 3, 2016, 09:29 AM
  • 02 1656_02 1655_1132016_023730.mp4

Date
11/03/2016
W/O
597130
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00289
PipeID
P18811
Time
2:29 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0330
Sewer Name
02 MONTEREY PARK EXTENSION TRUNK
City
MONTEREY PARK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
09
Purpose
Routine Assessment
Project
20161103MDM_MONTEREY_PARK_EXTENSION_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
02 1656
Downstream MH
02 1655
Dir. of Survey
Downstream
Length Surveyed
236.6 ft.
Total Length
236.7 ft.
Structural Index
3
Structural Quick
4123
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 02 1656 to 02 1655
MH: 02 1656MH: 02 1655downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:20AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED3.5 ft. MGO - General Observation - MAG COAT 40% 8:00 TO 4:00 START19.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open43.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open55.2 ft. MGO - General Observation - MAG COAT 20% START55.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED67.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open101.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open125.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open155.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open165.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED169.9 ft. MGO - General Observation - 15" NRCP236.2 ft. MGO - General Observation - MAG COAT 20% FINISH236.2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG236.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED236.7 ft. AMH - Downstream Manhole, Survey Ends - 3:00AM

Observation photos (6)

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • General Observation - MAG COAT 40% 8:00 TO 4:00  START

    3.5 ft. - General Observation - MAG COAT 40% 8:00 TO 4:00 START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED

    55.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

    165.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

  • General Observation - 15" NRCP

    169.9 ft. - General Observation - 15" NRCP

Observations (20)

DistanceCodeObservation
236.2MGOMAG COAT 20% FINISH
236.2SAMSEVERE AGG
67.8TFOpen
3.5MGOMAG COAT 40% 8:00 TO 4:00 START
2SAMSEVERE AGG
165.7SSSPEELING CONCRETE SEVERE AGG ATTACHED
19.9TFOpen
55.2MGOMAG COAT 20% START
2SSSPEELING CONCRETE SEVERE AGG ATTACHED
169.9MGO15" NRCP
0AMH2:20AM
236.7AMH3:00AM
0MWL
43.7TFOpen
236.2SSSPEELING CONCRETE SEVERE AGG ATTACHED
0MWM
155.8TFOpen
125.9TFOpen
101.4TFOpen
55.2SSSPEELING CONCRETE SEVERE AGG ATTACHED

Properties (4)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
2
customer
LACSD
datetime
2016-11-03T02:29:00-07:00