01 0917_01 0916_1122016_044825.mp4
0 ft. - General Observation - REMOVED 6' TO 25' MEASURE POLE FROM MH
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AQGG AREAS OF MISSING TILES
2 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM REBAR
7 ft. - General Observation - MISSING TILES 20% START
25.6 ft. - General Observation - MISSING TILES 90% START
30.8 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
36.1 ft. - General Observation - MISSING TILES 20& START
57.9 ft. - General Observation - MISSING TILES 100%
65.2 ft. - General Observation - 20% MISSING TILES
78.5 ft. - General Observation - MISSING TILES 100%
80.6 ft. - Surface Reinforcement Visible, from 11 to 02 o'clock, within 8 inches of joint: NO - CIRCUM
84 ft. - General Observation - MISSING TILES 20%
| Distance | Code | Observation |
|---|---|---|
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 25.6 | DSZ | MIISSING TILES |
| 25.6 | MGO | MISSING TILES 90% START |
| 7 | MGO | MISSING TILES 20% START |
| 30.8 | SRV | CIRCUM REBAR |
| 2 | SAM | SEVERE AQGG AREAS OF MISSING TILES |
| 2 | MGO | 90% MISSING TILES START 8:00 TO 4:00 |
| 97.4 | AMH | 5:10AM |
| 84 | MGO | MISSING TILES 20% |
| 78.5 | MGO | MISSING TILES 100% |
| 0 | MWL | SLOW FLOW |
| 0 | MWM | — |
| 0 | MGO | REMOVED 6' TO 25' MEASURE POLE FROM MH |
| 0 | MGO | TRAFFIC HAZZARD TO SET-UP THIS LOCATION |
| 97 | MGO | MISSING TILES 20%FINISH |
| 97 | SAM | SEVERE AGG |
| 0 | MGO | Conn. @ Mh, 2 O' Clock. Active |
| 57.9 | MGO | MISSING TILES 100% |
| 7 | SRC | LONG % CIRCUM REBAR |
| 2 | SRC | LONG & CIRCUM REBAR |
| 80.6 | SRV | CIRCUM |
| 65.2 | MGO | 20% MISSING TILES |
| 0 | AMH | 3:00AM |
| 36.1 | MGO | MISSING TILES 20& START |