Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 28, 2016, 09:03 AM
  • B 0400_B 0399_1282016_013815.mp4

Date
01/28/2016
W/O
0547079
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00091
PipeID
P08912
Time
1:03 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
HOO34
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
07
Purpose
Routine Assessment
Project
20160128MDM_JOINT_OUTFALL_B_UNIT_5A
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
B 0400
Downstream MH
B 0399
Dir. of Survey
Downstream
Length Surveyed
355.9 ft.
Total Length
355.9 ft.
Structural Index
3
Structural Quick
5231
Structural Rating
19
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
23
Pipe schematic from manhole B 0400 to B 0399
MH: B 0400MH: B 0399downstream0 ft. MGO - General Observation - MH CONN OPEN 9:000 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 1:05AM0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG47.8 ft. MGP - General Photograph - 24" RCP61.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING BLISTERING61.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish61.5 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC128.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active154.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open182.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING LAITANCE COAT182.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - VERY SPORATIC241.9 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish241.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open282.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6", 6"290.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open301.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE339.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open347 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN355.6 ft. MGO - General Observation - MH CONN OPEN 3:00355.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING BLISTERING LAITANCE COAT355.9 ft. AMH - Downstream Manhole, Survey Ends - 1:55AM

Observation photos (7)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Photograph - 24" RCP

    47.8 ft. - General Photograph - 24" RCP

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING BLISTERING

    61.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING BLISTERING

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    61.5 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING LAITANCE COAT

    182.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING LAITANCE COAT

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - VERY SPORATIC

    182.2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - VERY SPORATIC

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    301.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

Observations (24)

DistanceCodeObservation
339.4TFOpen
0MGOMH CONN OPEN 9:00
301.7SSSPEELING CONCRETE
241.9SRV
0MGOConn. @ Mh, 3 O' Clock. Active
47.8MGP24" RCP
355.6MGOMH CONN OPEN 3:00
182.2SSSPEELING LAITANCE COAT
61.5SSSLAITANCE COAT PEELING BLISTERING
182.2SRVVERY SPORATIC
290.6TFOpen
0AMH1:05AM
2SAPSEVERE AGG
154.1TFOpen
347TFOPEN
355.6SSSPEELING BLISTERING LAITANCE COAT
0MWM
0MWL
61.5SAP
355.9AMH1:55AM
128.9TFActive
282.9TFC
61.5SRVSEVERE AGG SPORATIC
241.9TFOpen

Properties (4)

custom_field_three
SEVERE PROJECTING AGG
custom_field_two
3
customer
LACSD
datetime
2016-01-28T01:03:15-08:00