05 0635_05 0634_1262016_041745.mp4
05 0635_05 0634_1262016_041920.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT SWOLLEN BLISTERING
2 ft. - Deposits Attached Grease, 30 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES, Start
10.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO
16.9 ft. - Deposits Attached Grease, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO
38.6 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
137.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - SWOLLEN LAITANCE COAT
267.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO
294.8 ft. - Roots Medium Connection, from 12 to 04 o'clock, 35 %, within 8 inches of joint: YES
294.8 ft. - Tap Factory Made Defective, at 12 o'clock, -, within 8 inches of joint: YES, 6" - 80% ROOTS
378.7 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
575.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 594.8 | MGO | MH CONN STUB 9:00 |
| 2 | SSS | LAITANCE COAT SWOLLEN BLISTERING |
| 294.8 | RMC | — |
| 594.8 | MGO | MH CONN OPEN 3:00 80% GREASE |
| 594.8 | SSS | — |
| 594.8 | DAGS | — |
| 0 | MWL | — |
| 2 | DAGS | — |
| 575.1 | SSS | — |
| 38.6 | DAGS | — |
| 262 | TB | Open |
| 10.8 | SSS | — |
| 0 | MWM | — |
| 294.8 | TFD | 80% ROOTS |
| 378.7 | DAGS | — |
| 137.2 | SSS | SWOLLEN LAITANCE COAT |
| 38.6 | DAGS | — |
| 0 | AMH | 4:15AM |
| 575.1 | DAGS | — |
| 595.2 | AMH | 5:15AM |
| 267.2 | SSS | — |
| 16.9 | DAGS | — |