05 0637_05 0636_1202016_021936.mp4
2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING BLISTERING UNDER MAG COAT
2 ft. - General Observation - MAG COAT 95%9:00 TO 3:00 START
51.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT
104.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - BLISTERING LAITANCE COAT
104.1 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
104.1 ft. - General Photograph
112.6 ft. - General Observation - MAG COAT 80% START
324.4 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES
379.5 ft. - General Observation - CURVING PIPE
| Distance | Code | Observation |
|---|---|---|
| 0.1 | MWM | — |
| 104.1 | SSS | BLISTERING LAITANCE COAT |
| 0.1 | MWL | — |
| 104.1 | DAGS | — |
| 430 | MGO | MAG COAT 90% FINISH |
| 104.1 | DAGS | — |
| 430 | DAGS | — |
| 430 | SSS | LAITANCE COAT BLISTERING PEELING UNDER MAG COAT |
| 0.1 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 430.4 | AMH | 2:45AM |
| 0 | AMH | 1:50AM |
| 2 | DAGS | — |
| 51.8 | SSS | BLISTERING LAITANCE COAT |
| 2 | SSS | LAITANCE COAT PEELING BLISTERING UNDER MAG COAT |
| 112.6 | MGO | MAG COAT 80% START |
| 324.4 | DAGS | — |
| 390.3 | MGO | MAG COAT 90% START |
| 104.1 | MGP | — |
| 379.5 | MGO | CURVING PIPE |
| 2 | MGO | MAG COAT 95%9:00 TO 3:00 START |