18 0316_18 0315_1192016_005745.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING
13.2 ft. - General Photograph
13.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
25.1 ft. - Surface Aggregate Visible, from 12 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
53 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
180.2 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR POSSIBLE
237.2 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG
237.2 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
270.4 ft. - Surface Reinforcement Visible, from 10 to 12 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
273 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
276.3 ft. - Surface Reinforcement Corroded, from 09 to 12 o'clock, within 8 inches of joint: YES - CIRCUM
319.4 ft. - Water Mark, 30 %of cross sectional area
462.6 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | LAITANCE COAT PEELING |
| 237.2 | SAP | SEVERE AGG |
| 180.2 | SRV | CIRCUM REBAR POSSIBLE |
| 13.2 | MGP | — |
| 319.4 | MWM | — |
| 462.6 | SRV | CIRCUM REBAR |
| 273 | SRV | CIRCUM REBAR |
| 276.3 | SRC | CIRCUM |
| 237.2 | SRV | CIRCUM REBAR |
| 486.7 | AMH | 1:35AM |
| 486.3 | SSS | PEELING LAITANCE COAT |
| 13.2 | SSS | PEELING CONCRETE |
| 0.5 | MWM | — |
| 486.3 | SAV | SEVERE AGG |
| 276.5 | DSZ | ROCK |
| 53 | SAV | SEVERE AGG SPORATIC |
| 214.6 | TFC | — |
| 270.4 | SRV | CIRCUM REBAR |
| 0.5 | MWL | — |
| 276.5 | SRV | — |
| 25.1 | SAV | SEVERE AGG |
| 0 | AMH | 12:45AM |